SWH project part 14 - glazing
Or possibly plasticking.
![]() |
| Specially procured polyurethane insulation for the backs of the panels. The Pakistanis' favourite cheap styrofoam is no good as it has a tendency to melt at the temperatures we'll be asking of it. |
![]() |
| 3 down, 7 to go. We've also insulated all the hot pipe runs with fibreglass wool. |
![]() |
| Trying to screw stuff into place while holding it upwards onto a slope of 50° is not easy. |
Thursday, May 26, 2011
SWH project part 13 - plumbing
![]() |
| Pipe-laying in the trench. Since it was dug a few weeks ago up to 3 feet of vegetation has sprung up along its edges. |
![]() |
| Every joint requires you to cut 2 screw threads with this die, which is no mean feat even when you're not trying to do it in the trench. |
![]() |
| Cold line, sensor cable conduit, hot line (which needs some attention with the tape...) |
![]() |
| Coiling the heat exchangers. Strangely, they coiled beautifully in this direction, but when we started trying to bend the ends upwards, it was threatening to kink at every opportunity. |
![]() |
| So, how complicated can we make this? |
![]() |
| Copper coils successfully installed, and due a little de-kinking with the pliers. |
![]() |
| Still, at least all the parts likely to suffer from galvanic corrosion are cheap, on the outside, and easily replaceable. |
![]() |
| We have water! |
![]() |
| Data logger up and running. Had a few short circuit problems to sort out when I discovered a couple of the sensors weren't as waterproof as I might have liked. |
![]() |
| I'm still in love with the colours of frazzled copper. |
Saturday, May 14, 2011
SWH project part 12 - welding*
*or in actual fact, brazing. But everyone here seemed to call it welding...
This has been a busy week, which may or may not have had anything to do with Mr P's out-of-the-blue announcement the other week that "I think we should have it up and running by the 15th". Perhaps a little over-optimistic given that that's tomorrow, but nice to have some sudden ambition introduced to the proceedings.
This has been a busy week, which may or may not have had anything to do with Mr P's out-of-the-blue announcement the other week that "I think we should have it up and running by the 15th". Perhaps a little over-optimistic given that that's tomorrow, but nice to have some sudden ambition introduced to the proceedings.
So the panels have been fitted into the frames, and their tubes welded together and leak tested. Pipes to connect the system with the laundry have been purchased, along with glass wool sheets to insulate them with. Polyurethane foam sheets for the backs of the panels have been ordered, produced and delivered. My temperature monitoring system is pretty much complete, and semi-installed (more on that another day).
A good week's work.
A good week's work.
![]() |
| Fitting the panels required a spot of saw-wielding. |
![]() |
| First three in place - some dropped in beautifully; others had to be beaten into submission with planes, saws, hammers and a little brute force. |
![]() |
| A couple of chaps came up from Lahore to do our welding. After they'd been connected together some of the panels required re-beating-into-submission. |
![]() |
| Lugging those oxygen cylinders across the orchard is no joke... |
![]() |
| The pretty colours of tortured metal. |
![]() |
| A leak! But actually in one of the previous welds from when the panels were fabricated. Still, 1 out of 164 ain't bad. |
![]() |
| Take that pesky leak! |
Tuesday, May 10, 2011
Holidays part 5 - Naran & Lake Saiful Muluk
One of the main highlights was this expedition up to Lake Saiful Muluk. In summertime you can take a jeep part of all of the way, but since the jeep track was buried under several feet of snow, we'd be walking the whole way.
![]() |
| A couple of km in, and well into the snow. The group ahead dropped behind us, and at some stage disappeared altogether. |
![]() |
| Don't look now, but you're being followed by half a pirate. |
![]() |
| Bashir goes ahead, kicking out steps for the rest of us - in his loafers. |
![]() |
| A long way up... |
![]() |
| Made it! - 4 hours, 10km and 2600ft of snow from Naran. |
![]() |
| Lake Saiful Muluk - somewhere under that lot! (click for large version) The big lumpy peak left-of-centre with the hanging glacier is Malika Parbat. |
![]() |
| Lunch consisted of the day's second set of parathas with omelettes inside. |
![]() |
| The descent took just over half the time of the ascent. |
![]() |
| The slidey-trails go back a long way up! |
![]() |
| Next day we went for a gentler and flatter walk a little way up the main valley. Here's the next wee village, currently deserted. |
![]() |
| After a pause for a drink, we decided to go and see what what was round the corner before heading back - this was what we found. (click for large version) |
![]() |
| Halfway through this glacier we met a stuck minibus. |
![]() |
| One more reminder of the flood's toll on the road. |